Skip to content
RALTIQO Engineering

2026 / Commissioning

WEC Frans Hals

Stern-thruster feedback and control calibration

Service of the Brunvoll stern-thruster pitch-feedback loop, command direction and bridge indication.

Discipline
Propulsion & steering
Period
2026
WEC Frans Hals: Stern-thruster feedback and control calibration

Technical scope

Work and verification

  1. 01

    Replacement of the defective pitch-feedback potentiometer.

  2. 02

    Alignment of mechanical pitch zero, electrical feedback and bridge indication.

  3. 03

    Verification of manual and remote response, including functional checks under load.

Documented outcome

The final report records correct response to bridge commands after adjustment and testing. No PLC software modification was required.

WEC Frans Hals: Stern-thruster feedback and control calibration, detail view 1WEC Frans Hals: Stern-thruster feedback and control calibration, detail view 2

Engineering support

Let's discuss your next scope.

Tell us the equipment type, location, symptoms and required timing. Drawings, alarm records and service history help assess the work.