Skip to content
RALTIQO Engineering

2026 / Technical assessment

Naama Borchard

CPP command and feedback analysis

Operational comparison of controllable-pitch propeller behaviour with the vessel-specific combinator characteristic.

Discipline
Propulsion & steering
Period
2026

Technical scope

Work and verification

  1. 01

    Recording of command position, actual pitch, feedback and engine-load indications.

  2. 02

    Comparison of Siemens S7-1200 command processing with the ABB N1 combinator function.

  3. 03

    Assessment of feedback scaling and requirements for complete control-chain synchronisation.

Documented outcome

The report identifies a mismatch between the command characteristic and the required combinator curve. Final commissioning remained subject to corrective work and repeat trials.

Engineering support

Let's discuss your next scope.

Tell us the equipment type, location, symptoms and required timing. Drawings, alarm records and service history help assess the work.